Financial Support Program

A long-term, low-interest loan support program for the installation of renewable energy facilities and equipment for the production of dedicated products.

Funding Support Conditions

Use of Funds Maximum Support per Business Entity Loan Period Interest Rate Support Ratio to Total Project Cost
Wind Power Sector Up to KRW 75 billion 5-year grace period, 10-year installment repayment Quarterly Variable Interest Rate
  • SMEs (Individuals · Cooperatives)
    Up to 75%
  • Mid-sized Enterprises
    Up to 35%
  • Large Enterprises Participating in RE100
    (Self-consumption)
    Up to 55%
Solar Power Sector Up to KRW 30 billion 5-year grace period, 10-year installment repayment
Bio Sector Up to KRW 10 billion 3-year grace period, 5-year installment repayment
Other Energy Up to KRW 15 billion 5-year grace period, 10-year installment repayment
Production Funds Up to KRW 30 billion 5-year grace period, 10-year installment repayment
Bio Sector Up to KRW 10 billion 3-year grace period, 5-year installment repayment

Funding Support Conditions

Category Details
Facility Funds Purchase cost of applicable facilities (excluding used equipment) and auxiliary equipment, installation and renovation costs (including grid connection costs), repair, design and supervision costs (including technology introduction costs), test operation expenses, etc. (However, hydro facilities exceeding 5MW are excluded)

- VAT, land purchase costs, construction expenses not directly related to building installation, and licensing costs are excluded

Eligible Facilities

Category Details
Solar Thermal Facilities Facilities for producing and installing solar thermal collectors certified under renewable energy equipment certification, KS-certified products, or equivalent equipment (excluding natural circulation integrated solar thermal systems)
Solar Power
Facilities
Facilities for power generation and transmission, or facilities for producing such equipment
Including resident participation portions such as bonds, stocks, and funds of village enterprises participating in power generation projects
Process
  • 01
    Project Announcement
    The New & Renewable Energy Center announces the project and confirms
    eligible applicants after document review.
    New & Renewable Energy Center
  • 02
    Online Application for Funding
    Applicants submit their funding application online.
    Applicant
  • 03
    Document Review and Evaluation
    The Center/Comprehensive Support Center reviews the submitted documents,
    requests supplementation if necessary, and conducts the final evaluation.
    Center/Comprehensive Support Center
  • 04
    Issuance of Recommendation Letter
    After evaluation is completed, the Center issues a recommendation letter.
    Center/Comprehensive Support Center
  • 05
    Loan Application
    After receiving the recommendation letter, the applicant visits a financial institution (bank)
    for loan screening and approval.
    Applicant
  • 06
    Fund Disbursement (Initial and Interim Withdrawals)
    After loan approval, the initial withdrawal is made,
    and additional withdrawals may be made until the end of the year if necessary.
    Applicant
  • 07
    Facility Installation and Completion Inspection
    Once installation is completed, inspection and completion verification are conducted.
    After certification procedures are completed, the remaining funds are disbursed.
    Applicant
  • 08
    Post-Management
    After final completion, on-site inspections and operational management
    procedures are carried out.
    Center/Comprehensive Support Center