By removing high-voltage transformers within industrial sites (factories) and
installing KEPCO's low-voltage transformers to receive direct low-voltage power,
electricity
costs can be reduced by 25–35%.
Project introduction and
business content review
1st on-site inspection
Final on-site inspection
Project introduction and
business content review
Installment repayment
contract availableCompletion
takes 3–4 months
Construction period
takes 2–3 weeks
Pre-use inspection required
upon completion
Defect repair during
the project period
Verification of cost savings
for a certain period